Welcome Features History Purchasing Guide Sitemap Contact
Exterior Interior Signage Civil Work Housing Vehicles
ALPOLIC® A2 ALPOLIC®/fr TCM, SCM, ZCM ALPOLIC®/fr LT ALPOLIC® AL-LEADER™ ALPOLIC®/fr-RF
Exterior Interior Signage Civil Work Housing Vehicle
Summary Downloads Q&A Lightweight Rigidity Flatness Fire Safety Finishes Processing Installation Maintenance Quality Energy Saving Recycling
Global Distribution Network Time Frame From Order To Shipment (Lead-Time) General Guidance to Place Orders for ALPOLIC/fr General Guidance for Other Products (Tabular Format) Stock Items
Time Frame From Order To Shipment (Lead-Time)
Ordering process
Purchase order and color match
to be approved, if necessary
 
To be confirmed
Color, Gloss
Thickness, Panel size
 
Production lead-time
6 - 8 weeks
 
Transportation for delivery
Depending on the destination

Note 1:
The above time frame is pertinent to the standard ACM products: namely, ALPOLIC®/fr, ALPOLIC®/fr LT, ALPOLIC®, and AL-LEADER™.
Note 2:
TCM (Titanium Composite Material), SCM (Stainless Steel Composite Material) and ZCM (Zinc Composite Material) requires longer lead time than the above. Refer to "General Guidance (Tabular Format)" of each product.

Back

Products
aboutus